Skip to main content
Adaptive Planning
Last Updated: 2023-06-23
View and Run Tasks

View and Run Tasks

When you navigate to Integration, the integration Tasks Overview page loads by default. Integration tasks are predefined sets of actions created as an import flow.
Tasks can contain:
  • Multiple data sources.
  • Multiple loaders.
  • Other tasks.
The overview displays all existing scheduled and unscheduled tasks you can view or run.
Each row in the Tasks Overview displays:
  • Task Name.
  • Task Status.
  • Next Scheduled Run.
  • Last Run.

Navigation

From the nav menu, go to
Integration
Overview
.

  • Permissions Required:
    Integration
    >
    Integration Operator
  • Verify someone with
    Integration
    >
    Data Designer permissions
    set up tasks for you to view
  • Verify someone with
    Integration
    >
    Data Designer
    permissions granted you launch permissions for the tasks you want to run

View Task Details

  1. (Optional) Click
    Failed Tasks
    to view and troubleshoot unsuccessful tasks.
  2. Click a
    Task Name
    to view a task.
  3. Click a task run to view its:
    • Status
    • Component
    • Summary
    • Event Time
    • Log Level
    • Details
  4. (Optional) Select
    Run
    if you want to launch a task manually and provide parameters. Required fields vary depending on the task.
    • Tasks for spreadsheet data sources prompt for a file.
    • Tasks for scripted data sources may prompt for run-time parameters.
    If you have a scripted data source or loader, you get prompted with the parameter set to the default value. You can override the parameter for that individual manual run. Scheduled tasks use the default parameter.
  5. (Optional) Select
    Cancel
    to stop a running task.