Create Holiday Calendars
- Create calendar rules so that you can assign the holiday schedule to workers.
- Security:Set Up: Calendardomain in the System functional area.
Create a calendar that lists holidays.
In Workday Time Tracking, holiday calendars affect the dates that are considered holidays on the worker's time entry calendar. Holiday calendars also affect the results of Time Tracking report fields that are based on holidays.
In Absence Management, holiday calendars affect the dates that are considered holidays when worker's are requesting and viewing absence on calendars that display time off and leave. The holiday calendar also affects the results of Absence report fields that are based on holidays.
If you use an Enterprise Interface Builder (EIB) integration to upload data for an existing holiday calendar, include calendar rules in the EIB. Otherwise, Workday removes the calendar rules on the existing holiday calendar.
- Access theCreate Holiday Calendartask.
- (Optional) Select aCountry / Country Region.TheCountry / Country Regionprompt enables you to:
- Filter calendar rules based on workers' location.
- Assign location-based eligibility rule.
For workers with multiple positions, the filter looks at the worker’s location for the primary position. - (Optional) Select aCalendar Ruleto assign the calendar to workers.Use theCountry / Country Regionprompt to assign a location-based eligibility rule instead of adding a location-based calendar rule.For workers assigned multiple calendars, events that occur on the same date cause workers to receive the sum of the time from the events. Example: If 2 calendars are assigned to a worker and an event occurs on both calendars on the same date, the worker receives the sum of both events.
- Add holidays to the calendar.
- Access theView Worker Calendarsreport to see a worker's assigned holiday and work schedule calendars.
- Access theView Worker's Time Eligibilityreport to verify if the worker is required to work the day before or after a holiday, or both days.